Step 4 of 12 · Ch 4, 18
4. Assemble & level
Mechanical inspection and square gantry — power off.
⚠ Caution — Keep clear of motion
Never work under a moving gantry or place hands near racks, pinions, belts, bearings, torch lifters, or cable chains while energized.
1. Power-off mechanical inspection
Follow Chapter 4.1. Your model packing order and fastening torque come from Premier machine docs — do not invent fastener specs here.
2. Level and square
Level the frame per Premier procedure for your table. Square the gantry using the approved physical reference. Equal diagonals on a large rectangle later prove square after motion is live.
Tip: Move accessible axes only by the approved manual method. Do not force a powered or braked motor.