Premier Plasma Tech HelpPremier Plasma Tech Help
← Drawing → first cut

Step 4 of 12 · Ch 4, 18

4. Assemble & level

Mechanical inspection and square gantry — power off.

⚠ Caution — Keep clear of motion

Never work under a moving gantry or place hands near racks, pinions, belts, bearings, torch lifters, or cable chains while energized.

  1. 1. Power-off mechanical inspection

    Follow Chapter 4.1. Your model packing order and fastening torque come from Premier machine docs — do not invent fastener specs here.

  2. 2. Level and square

    Level the frame per Premier procedure for your table. Square the gantry using the approved physical reference. Equal diagonals on a large rectangle later prove square after motion is live.

    Tip: Move accessible axes only by the approved manual method. Do not force a powered or braked motor.

Stuck? Text or call Tech 602-899-1115

Real humans