Premier Plasma Tech HelpPremier Plasma Tech Help
← Drawing → first cut

Step 2 of 12 · Ch 4

2. What's in the crate / flat-pack

Inventory and protect parts before assembly.

  1. 1. Inventory against your pack list

    Your shipment contents are machine-specific. Photograph the open crate, label bags, and keep fasteners with their assemblies. Do not discard packing until the first verified cut.

    Tip: If something is missing or damaged, text a photo to Tech 602-899-1115 before forcing assembly.

  2. 2. Remove shipping restraints later in order

    Chapter 4 mechanical inspection starts with power off: remove shipping restraints and confirm nothing remains in racks, rail paths, water pan, slats, or cable-chain travel — that happens during assemble & level.

Stuck? Text or call Tech 602-899-1115

Real humans